Valley Line LRT | TransEd/Marigold | City of Edmonton

LRV update:

The first Valley Line West Light Rail Vehicle (LRV) is scheduled to arrive in Edmonton by summer 2025, following months of rigorous testing in South Korea. This includes low-speed dynamic testing, systems validation and a final inspection.

Additional vehicles in the 46-LRV fleet are in various stages of assembly and testing.
 
IMG_20250616_145132600_HDR.jpg
IMG_20250616_150713179_HDR.jpg
IMG_20250616_151030947_HDR.jpg
IMG_20250616_153203764_HDR.jpg
IMG_20250616_153758094_HDR.jpg
 
Is that not two different locations that are being compared? Funny.
Good point. I think the top one is just north of Glenora School and facing east, and the bottom one is at 133 street facing west.
 
What's the point of what - say a $5,000 planter with material and labor if they don't use it for it's intended us? Strange how TransEd is re-planting 1000's of shrubs and trees along the Millwoods length - not sure about the other length's - but they can't plant itty, bitty $1 petunias in these things?
 

Back
Top