The_Cat
Senior Member
I hope that testing can carry on into the evening and even night.
Yes, I would hope at some point they run out of previously undiscovered problems to discover.For whatever reason I am feeling unbelievably optimistic that this LRT line will actually open before the calendar flops over to 2024.
Would be nice to also have the west’s Q2 report as well
I wonder what will happen to that portion of 156? Little dead end turnaround with landscaping? Wish they’d add a good MUP for accessing the library there. Connecting to 92ave at minimum, or ideally 95ave (the district connector that’s being built soon), would be huge for accessibility.Meadowlark Road:
I wonder what will happen to that portion of 156? Little dead end turnaround with landscaping? Wish they’d add a good MUP for accessing the library there. Connecting to 92ave at minimum, or ideally 95ave (the district connector that’s being built soon), would be huge for accessibility.
Anyone got non Twitter links? I can't view them anymore without signing up apparentlyElevated guideway over 170 Street: