Valley Line LRT | TransEd/Marigold | City of Edmonton

Just a few from around 97 Street - Churchill Square

P8150623.jpg

P8150621.jpgP8150622.jpgP8150623.jpgP8150626.jpgP8150627.jpgP8150636.jpg
 
Some photos from yesterday afternoon.

96 Street portal and underground storm water retention tank under Quarters Stop.

5695EEAD-4ACF-479D-9681-5827C9A2E6B8.jpegE2E21874-ACA8-4432-887F-DC806F12EB2B.jpeg

97 Street intersection

118A42AC-AC53-4D82-95C2-0F7D036B7FDB.jpeg6C486ADF-31B6-406A-A41E-E4C145B72127.jpegC97C014A-D16C-4ACB-8634-B0F1CC840B94.jpeg

A short section of 102 Avenue has been redone near Canada Place.

89B155FC-DE71-4D58-B18F-2403DD59D42C.jpeg

100 Street, looking east and west

492D0601-79B8-4D89-964E-1140FFCE034E.jpeg701ACE2E-42F9-4F87-AFF3-61C0F3DD0C03.jpeg

Rice Howard Way, looking west and east

B28F8A9F-9832-4B2B-850F-5A09CABA0342.jpeg816051BE-F9FF-49EA-900E-1DD1BCF5CE84.jpeg

101 Street, looking east and west

3408E605-46A3-421D-AB4F-07A36CEC9715.jpeg2E1BADB9-6B18-40E8-8D06-65607FB447B0.jpeg
 
From Saturdays Quarters to China town walk.

2019-09-07 282.JPG


2019-09-07 280.JPG


2019-09-07 298.JPG

The approximate view looking from the Tawatinâ Bridge over the North Saskatchewan river. Its' a bugger to climb up those damn columns and I highly recommend waiting for the Valley Line's completion sometime in the next year (or two)... ?
2019-09-07 295.JPG
 
A big update today in two parts. First post will take you from Downtown to Argyll Road.

Trackwork progressing in the heart of downtown.

E8B4554B-A8DE-4C66-B2AA-815E5FCAD746.jpegD8677D27-9599-4212-A521-097F9992B185.jpeg77830C57-7FFD-4501-AA50-5670F68030C9.jpeg

Churchill Stop

E7BF851C-4A24-4279-9DFA-A73B057D9BB1.jpeg

Between 99 and 97 Streets they are installing a noise/vibration dampening system because of nearby Citadel and Winspear.

58EFE6B0-E74E-4C5C-8046-238D26DE49BD.jpegEA85E503-534F-4C36-90B1-B5170165E35D.jpeg

The storm water retention tank underneath Quarters Stop is progressing.

3BEE9843-9BA5-4907-822E-29960C2EBB8E.jpegB93E8645-1DBC-46DD-9C90-48029C6C3242.jpeg

Connors Hill

022DB051-582B-489F-B3BF-F453E10ECFA5.jpeg93D583C8-4709-4BDC-8835-4D69689B0694.jpeg

A bunch of shots of the progress on 95 Ave. They were definitely pushing to get this done before the snow flies. I probably saw about 25 people working on this section.

CD06575C-2325-46A1-81F2-5D32EB142928.jpegBF45D2CA-58F2-4C4D-831E-C98D9A9EFB14.jpeg7193B9FB-0B7A-4B49-B8D4-BC9097637085.jpeg9599156A-1285-43CC-A944-F3C466518AC4.jpeg3AD78BBB-65A4-469A-A2E7-CD87B7009300.jpeg
 
I didn’t realize there was a 15 attachment limit. So here’s Part 2 of Part 1!!

A couple of more photos of 95 Ave through Strathearn.

D4FC6564-D002-492E-A4E6-E401CE9203A5.jpeg479CB38E-F106-4C1B-A507-D0ECCCEB0ED4.jpeg

85 Street. The last shot is of Holyrood Stop.

BF6DAF43-5CF9-455E-BC03-2706F0E0D8E4.jpegB1BF7197-54A4-4093-83AB-2911E89CF8C0.jpeg4E6A3337-CC9D-486F-9DB4-D1318231ECF4.jpeg

Connors Road intersection

D073EF6A-4C46-43BD-8FE9-34B0D07BE2B1.jpeg

Beside Bonnie Doon mall, the last photo being the progress on Bonnie Doon stop

E0A4247A-471D-45A9-9F2E-B8967249B697.jpeg1C6DFD12-FBC6-4E60-9228-D7DB9E083337.jpeg7ED55C2E-2969-468C-B0DB-7720D4F7928D.jpeg

83 Street south of 82 Ave. Both sides of the road are complete and they’re getting ready to put the track in.

BA193B9F-60B5-4C07-865A-2E0971E42B79.jpeg821105C5-7C88-48EA-A504-D7D1AB2FE122.jpeg

Landscaping is mostly complete south of 76 Ave.

BDE57B5B-81A8-4522-AA1B-23A27540ECEC.jpeg

Avonmore Stop

71940B40-4EC0-4062-AA69-AA0F193B65C2.jpeg

Some embedded rail is in place:

11EC2C46-6463-4A00-B0D5-CE31B31AF918.jpeg

And finally the north approach to the Davies elevated section.

3CB2F2D5-9591-4492-ADAA-1D07BD5AB6A6.jpeg

Watch for part 2 in a few hours after I’ve finished walking it! ?
 
Here’s part 2 of my 16.58 km walk!

There’s only a few sections of the Davies elevated track that need to be raised. The latest street to get shadowed by a span is Coronet Road.

46BE9320-28F2-4B7E-BCF2-73FAE455B10F.jpegC8B3B2D0-FF33-4249-9260-503C61B6763B.jpeg7C014762-4768-4B1D-8995-9C5B5C09894F.jpegFEE08C20-49C3-40DB-953B-2886D620222E.jpeg

A few photos of the line near the maintenance facility and the bridge over Whitemud Drive

E156F7A3-5DC0-42C4-A068-1931EC17B3C3.jpeg3EC28170-F26D-48E6-9A58-5BC5B1A8D616.jpeg8CD4BA43-C728-4642-A5A2-D1959EFD62AE.jpeg

Millbourne/Woodvale Stop

5D90935A-3C73-4DC4-8328-AD8BA3DC3902.jpeg

Along 66 Street. Notice sections of the catenary system is now getting wired and some landscaping is happening in the boulevard near Grey Nuns Stop.

9423D517-CA46-4649-940A-39DD93EA7F3C.jpeg47793869-17F1-407D-803A-CFA4B77D8883.jpegD5DD0077-FDF0-40BB-8317-A31D9E7A83F3.jpeg

Grey Nuns Stop

00381969-FE71-4464-8E87-C152DA76DF51.jpeg

And that’s it today. See y’all in a year!!
 

Attachments

  • 8BFC4F00-7AF1-4911-A669-C8A2A16D2BA8.jpeg
    8BFC4F00-7AF1-4911-A669-C8A2A16D2BA8.jpeg
    295.8 KB · Views: 339
  • 13AA1E49-29C0-4413-9924-572651ED0A8B.jpeg
    13AA1E49-29C0-4413-9924-572651ED0A8B.jpeg
    258.4 KB · Views: 320
  • F778BF43-BCE0-4896-ADF6-FA2123546A02.jpeg
    F778BF43-BCE0-4896-ADF6-FA2123546A02.jpeg
    247.7 KB · Views: 349

Back
Top