Valley Line LRT/ Valley Line West | ?m | ?s | City of Edmonton

20210816_164813.jpg
20210816_164827.jpg
20210816_164930.jpg
20210816_165915.jpg
20210816_170847.jpg
20210816_171121.jpg
20210816_171304.jpg
20210816_172329.jpg
20210816_172402.jpg
20210816_172618.jpg
20210816_173209.jpg
20210816_173608.jpg
 

Attachments

  • 20210816_165920.jpg
    20210816_165920.jpg
    292.3 KB · Views: 93
  • 20210816_170823.jpg
    20210816_170823.jpg
    325.3 KB · Views: 93
  • 20210816_172402.jpg
    20210816_172402.jpg
    257.1 KB · Views: 101
On my drive, I also saw the white signals being tested by the Millbourne/Woodvale station. Two LRT trains were nearby and I"m guessing that the trains will be tested with the signals. I also saw more message boards at some stations, and more switchtrack signals being installed.
 
Curious to know if these (doesn't appear to be) will use the wayfinding/signage standards?
 

Back
Top