Symphony Tower Edmonton | ?m | 27s | Allen Wasnea | KENNEDY

What do you think of this project?


  • Total voters
    20
Was wondering if this was ever coming back:

PERMIT_DATE March 26, 2020
JOB_CATEGORY Commercial Final
ADDRESS 9720 - 106 STREET NW
NEIGHBOURHOOD DOWNTOWN
JOB_DESCRIPTION Construction of pedestrian pedway (open-air metal staircase) between existing Symphony Tower and Alberta Legislature Grounds.
BUILDING_TYPE Apartment Condos (315)
WORK_TYPE (03) Exterior Alterations
CONSTRUCTION_VALUE 214,000
 
Gallagherr Park Saturday afternoon 2020-05-02 165.JPG
 
The Parkview Building and the House next to it, weren't they also to be updated during this build? It doesn't appear so?
They were supposed to following construction of the symphony, from what I understand construction is not fully complete just yet with some final condos still up for grabs and some common areas not fully complete. I assume this would be an as needed basis, which is very much needed.
 