Stantec Tower | 250.84m | 66s | ICE District Prop.

What do you think of this project?


  • Total voters
    58
PA210221.jpg


PA210239.jpg


PA210240.jpg
 

Attachments

  • PA210221.jpg
    PA210221.jpg
    1.2 MB · Views: 347
  • PA210239.jpg
    PA210239.jpg
    606 KB · Views: 351
  • PA210240.jpg
    PA210240.jpg
    730.2 KB · Views: 351
Via Email:
QSIdTJBbxgEjuuNFUF4_2gmkEIZfyRmUVypvTAipf3J9K6SQkGbmrHx7RkWy0mhKn5Hu_MuUwVjY1LOqUG5DmF0Hfl8rn1YGSPeIJ4PyMLJkTaUsd6kpiDwmRBiPsJjjpdZrtI2jmktIb20E5YyxtMmc55XcghUQKH-Q_A8=s0-d-e1-ft


Join us this weekend at the Grand Opening of our luxurious SKY Residences at ICE District Presentation Centre from 12 - 5 pm.
  • View our two beautiful show suites
  • See the 67-storey model of Western Canada's tallest tower
  • Browse interior finishes and floor plans
  • Walk around your future neighbourhood: ICE District
  • Meet with one of our experienced consultants
  • Buy in SKY
Located at 10210 - 104 Avenue NW, next to the Grand Villa Casino (get directions). Complimentary parking available in the Rogers Place parkade (first come, first served).

RSVP to the Grand Opening Event



Condo Features
Designer kitchens // Spa-inspired bathrooms // Open floor plans
Hotel-inspired grand lobby // 24/7 concierge & security

Condo Amenities
Outdoor fireplaces // Lounge areas (indoor and outdoor)
Gas barbecues // Demonstration kitchen and dining area
Rooftop patio // Oversized hot tub // Billiards club
Media room with large-screen TV // Business centre
Fitness centre // Yoga/pilates studio
Outdoor health & wellness terrace // Infrared sauna
Secure bicycle storage // Bicycle service station
Storage lockers // Dog spa with wash and dry stations
 
@Airboy Thanks for the info! Welcome to the forum, glad to have you here. I've long given up on SSP.

Are they doing it as a single continuous pour? Can that one pump handle it or is there another means to move concrete up? I'm really curious how they do such a large slab at that height.
 
Last edited:
I just noticed on one of the time-lapse cams that a second concrete pump has been added at the load transfer floor level.
 
@Daveography -- it was the north view camera and I should have snapzed it when it was extended -- now it is bunched up to the left and under the existing pump arm. I wouldn't recognize it now either. Played the time-lapse backwards and managed to get this shot...
Screenshot 2017-10-26 13.33.40.png
 

Attachments

  • Screenshot 2017-10-26 13.33.40.png
    Screenshot 2017-10-26 13.33.40.png
    602.5 KB · Views: 343
Last edited:

Back
Top