10123 106 Street | 24m | 7s | Westrich Pacific | Arc Studio

What do you think of this project?

  • I dislike it

    Votes: 0 0.0%
  • I dislike it a lot

    Votes: 0 0.0%

  • Total voters
    35
^ I read somewhere on SRC that it was concrete for parking and floor one and steel framing for the upper floors.
 
Shoring steel in, diggin’ time

IMG_9366.jpeg
 
Last edited:
I was here in 1983 when there was a great boom for office building downtown that then suddenly stopped. There are lots downtown I remember from the 1980's, probably the smaller buildings on them torn down for some project that never went ahead. After that for over the next 40 years Edmonton seldom had a long stretch of great demand for more office office downtown, so these lots mostly remained for parking.
 
Doesn't seem to be a lot of pictures if any at all of the buildings around the Warehouse park eh?
Well there hasn't been buildings on these lots for decades. As I recall there were more buildings there in the 1990's, but those were torn down and became parking lots, in addition to the other lots which were parking lots already in the 1980's or perhaps even earlier. Hence the sea of parking lots.
 

Back
Top