The_Cat
Senior Member
One thing that would make sense is if construction projects in Edmonton were running behind (with the possibility of fines) whether additional labour could be hired. Also, I wonder about whether certain intersections (e.g. 109 Street or 149 Street) could be assigned higher priority when track construction needs to be done.