Construction crews working on the Valley Line LRT have hit an unexpected obstacle hiding beneath the North Saskatchewan River. TransEd announced the discovery of a car-sized concrete mass buried nine metres under the north berm of the Tawatinâ Bridge, and while the hinderance won't affect the design of the bridge, it has forced crews to arduously rethink the construction area.
TransEd says the obstruction did not appear in any geotechnical investigations, and although they're unable to confirm where it came from and how it got there, they noted it was not natural to the riverbed. The mass was uncovered in the fall while building a cofferdam, a watertight enclosure that allows construction work below the waterline. Following unsuccessful attempts to drill and break the mass, TransEd has brought in several experts who are now developing a safe way to work around the obstruction.
While the Valley Line is still expected to be operational in 2020, the shared-use path that forms part of the Tawatinâ Bridge will no longer be completed by May 2019. TransEd did not disclose a new opening date for the path.
A number of open houses are being held in the closing weeks of March to inform the public about upcoming construction in their neighbourhoods:
March 17 (1:00-3:00 p.m.) at Holyrood Elementary School
March 19 (5:00-7:30 p.m.) at Riverdale Community League
March 20 (10:30-1:30 p.m.) at The Westin Hotel
March 21 (5:00-7:30 p.m.) at Mill Woods Seniors and Multicultural Centre
March 22 (5:00-7:30 p.m.) at King Edward Park Community League
March 28 (5:00-7:30 p.m.) at Cloverdale Community League
Additional images and information can be found in the Database file linked below. Want to get involved in the discussion or share your photos? Check out the associated Forum thread or leave a comment in the field provided at the bottom of this page.
Related Companies: | EllisDon |