Yup was checking it out to see if the twinning to the Jasper Park gates was on the radar. Nope. But adding more lanes to 16 west to 779 is in planning.
2024 Provincial Construction Program has the section from Peerless Lake to Ft Mach in Design /engineering this year. Look at it, the people in Chippewan Lake that commute to Ft Mack would have a close drive. Would also open a lot more back country to tourism. (Only resource roads up there now).
The west route is on Alberta's plan. I looked at the infrastructure Planning and it calls for the road to be built. There would be a couple of roads south off it since it would bisect roads into recourse area roads
I does look good I have to admit. But all the time I worked downtown it was under construction or so it seemed. It will feel nicer during this year's Marathon. Last few years that felt congested.
There was a lot of saw cutting not just trench drains and fridge lines but the sanitary had to have a complete upgrade adding greesetraps as well. I believe same superstructure work as well. adding new upblast exhaust fans to the roof.
oh sorry As was mentioned Defence Construction. Additional facilities at most bases. Suffield, Cold Lake and the Garrison. But additional work at the Bases in BC as well.
There are going to be a lot of court challenges coming. But it pisses me off. People I thought were smart are saying this will bring our taxes down. And another person said "she is only doing this to rattle everyone, it will never go through".
Millenium Park was a non starter., Why do we have to always develop wild lands. Even if it is a small grove. If they are going to borrow I would rather they spent it on Ray Gibbons or the New Rec centre.