Valley Line LRT | TransEd/Marigold | City of Edmonton

^I forget where, but I did see the Harbin Gate sitting in a dirt lot somewhere. Maybe they've kept it to put it back?

An old rendering...
DS9EMpYVMAEidHF.jpg:large

https://twitter.com/yegventures/status/950053039322353665

I really hope they put it back.
 
Anyone know when RFP for Valley Line West goes out? Also, I wonder if they would consider running 24h service on the Valley Line perhaps only on weekends, the G:Link that is very similar to the Valley Line does this IIRC and I can't imagine the costs are much higher to run these LRV's vs a bus?
 
Mayor says West LRT will not be built as a public-private partnership
Edmonton will not build the western phase of the Valley Line LRT through another private-public partnership, Mayor Don Iveson said Tuesday.

That’s going to be complex, he warned, because the first 13-kilometre phase of the new line between downtown and Mill Woods is being built, operated and maintained by TransEd, a private consortium of companies.

But Iveson said avoiding a second private-public partnership (known as a P3) is a simpler option. TransEd could still be responsible for running trains down the entire line without building or owning the second stretch of rail, he said.

https://edmontonjournal.com/news/lo...-not-be-built-as-a-public-private-partnership
 
Portal:

P9200169.jpg

P9200173.jpg P9200174.jpg P9200175.jpg P9200176.jpg

Churchill connector:

P9200178.jpg
 

Attachments

  • P9200169.jpg
    P9200169.jpg
    298.2 KB · Views: 521
  • P9200173.jpg
    P9200173.jpg
    248.4 KB · Views: 381
  • P9200174.jpg
    P9200174.jpg
    319.5 KB · Views: 384
  • P9200176.jpg
    P9200176.jpg
    337.4 KB · Views: 366
  • P9200175.jpg
    P9200175.jpg
    343.7 KB · Views: 390
  • P9200178.jpg
    P9200178.jpg
    325.6 KB · Views: 450
By the looks of it, they may have started building the Chinese roof piece over the portal. Very Exciting :).
 
Thought i'd make a list of transit oriented development's along the Valley Line.
(South to West)

Millwoods Town Centre Redevelopment: https://www.cbc.ca/news/canada/edmo...entre-lrt-valley-development-zoning-1.4028893

Bonnie Doon Mall Redevelopment: https://edmonton.skyrisecities.com/database/projects/bonnie-doon-mall-redevelopment

Holyrood Gardens Redevelopment: https://edmonton.skyrisecities.com/database/projects/holyrood-gardens-redevelopment

Strathearn Heights Redevelopment: https://edmontonjournal.com/news/lo...per-wants-13-million-deal-before-construction

Oliver Park Land Swap & Redevelopment: https://www.edmonton.ca/residential...hoods/st-johns-school-site-redevelopment.aspx

Brewery District North: https://skyrisecities.com/forum/thr...rict-north-m-19s-planworks-architecure.26040/

West Block: https://edmonton.skyrisecities.com/database/projects/west-block

Blue Chicago Redevelopment: https://edmonton.skyrisecities.com/database/projects/blue-chicago-redevelopment

Hopefully more projects as the west portion progresses.

I also noticed Alldritt owns multiple properties near the future 124th Street stop, they also have a sign up that says "future development". Maybe they are trying to assemble a piece of land large enough for something similar to their Blue Chicago redevelopment.
 
I have also heard the owner of Jasper Gates on 149 st is planning on building a more intensive site where there is currently a safeway, a few smaller businesses, and a massive parking lot.
RioCan owns it, they are the one's behind the Millwoods Town Centre redevelopment.
 
Does anyone have any idea when they will be placing the beams for the track on the supports here or at Davies Station?
 

Attachments

  • 4-Tunnel-Entrance_3-Sept-2018.jpg
    4-Tunnel-Entrance_3-Sept-2018.jpg
    313.3 KB · Views: 459
  • PROOF-159.jpg
    PROOF-159.jpg
    218.9 KB · Views: 454
  • 10-OMF_6-Sept-2018.jpg
    10-OMF_6-Sept-2018.jpg
    69.7 KB · Views: 466
  • 8-Conners-Hill_1-Sept-2018-1200x800.jpg
    8-Conners-Hill_1-Sept-2018-1200x800.jpg
    200.8 KB · Views: 488