Winspear Centre Completion Project | 29.87m | 4s | Winspear Centre | Andrew Bromberg

What do you think of this project?


  • Total voters
    40

Avenuer

Senior Member
Member Bio
Joined
Mar 8, 2019
Messages
1,716
Reaction score
10,275
Location
Inside the Henday
The District Energy component is getting taller:

C1D202A7-5429-4D57-9FA6-749722832A7E.jpeg
 

MCXavierL

Active Member
Member Bio
Joined
Oct 7, 2011
Messages
437
Reaction score
2,743
Location
Edmonton, AB
BP:

Jul 18, 2022
Commercial Final
STRUCTURAL FRAME ONLY 2nd level of above grade "music box superstructure" on top of the first level of the above grade superstructure (B.P. 341529008-036) and the existing one storey underground parkade (B.P. 286547690-002). Remainder of building to follow in separate permit submission-- "Francis Winspear Centre for Music
$8,500,000
10210 - 97 STREET NW
 

CplKlinger

Senior Member
Staff member
Member Bio
Joined
Dec 5, 2020
Messages
1,689
Reaction score
9,195
Location
Edmonton, Alberta
BP:

Jul 18, 2022
Commercial Final
STRUCTURAL FRAME ONLY 2nd level of above grade "music box superstructure" on top of the first level of the above grade superstructure (B.P. 341529008-036) and the existing one storey underground parkade (B.P. 286547690-002). Remainder of building to follow in separate permit submission-- "Francis Winspear Centre for Music
$8,500,000
10210 - 97 STREET NW
What's the purpose of breaking the BPs into phases like this? Quicker turnaround time for the city?
 

CaptainBL

Active Member
Member Bio
Joined
Dec 11, 2020
Messages
296
Reaction score
1,181
Ish... but from what I understand there have been multiple changes in scope, budget and design.
So should we be preparing for a watered down, bait and switch version of the original plan ala the Stanley Milner Library

Given the scope, design and budget change, I cant imagine we are going to be seeing something that will blow our minds out of the water that is better than the original version everyone was promised...
 