I listened to the livestream this morning on CTV. The TransEd CEO looked as though he was about ready for a stroke. That Q&A in French with the Radio-Canada reporter should have been much briefer.
“The cracks are due to thermal expansion issues that are related to the weather, he said.”

one more thing to blame on global warming???
 

northlands

Active Member
Member Bio
Joined
Jun 18, 2019
Messages
953
Reaction score
4,096
Location
Grandin
Extremely disturbing trend of substandard construction throughout this project. Every piece of concrete on this project needs to be subject to engineering testing and review at this point (which should have been done YEARS ago when the first batch of issues cropped up).
 

David A

Active Member
Member Bio
Joined
Sep 17, 2020
Messages
997
Reaction score
3,578
Oh well, that answers the question of why there still was no announcement of an opening date. Disappointing, but not surprising. Unfortunately, it seems to be quite a recurring theme with such large projects involving the City of Edmonton.

The blame the weather excuse is not a good one. Surely, the people involved with this should have had some understanding of Edmonton's weather patterns and planned accordingly. I suspect there will be a lot of finger pointing about this, which is sort of a bureaucratic reflex. However, in practice blame and responsibility are often shared.

It would be good if everyone who had a role in this owns up to it, but that might be too much to expect.
 

awstott

New Member
Member Bio
Joined
Jan 2, 2022
Messages
57
Reaction score
231
How did TransEd drop the ball this badly? This is on top of a bad concrete pour for the Whitemud overpass that required them to completely redo it a few years back.
Don't forget the 3 sections of elevated track they had to pull down and replace with brand new builds too. I have never seen a project waste so much concrete before in my life.
 

Calfaer

New Member
Member Bio
Joined
Jan 2, 2020
Messages
64
Reaction score
373
Wow, that's super disappointing. I'm astonished at how bad the concrete quality is and that the project was even allowed to progress to this stage, despite low initial quality test results. I really wonder at the internal decisions made to proceed forward.

The continual problems on LRT projects really sours its image, making public support for future public transit projects harder to get.
 

northlands

Active Member
Member Bio
Joined
Jun 18, 2019
Messages
953
Reaction score
4,096
Location
Grandin
I’ve heard CoE project managers who shut their phones off at 4:30 don’t help either
 

BrettB

Active Member
Member Bio
Joined
Jan 15, 2022
Messages
141
Reaction score
466
I get that this delay is frustrating. But to blame the City of Edmonton overlooks one key point: the P3 model (public-private-partnership) under which this leg was built was mandated by the federal government under the PPP Canada Fund announced in 2009.

An almost laughable quote from the original press release from then-finance minister Jim Flaherty: "P3s have demonstrated their ability to deliver public infrastructure on-time and on-budget" said Minister Flaherty. "The P3 Canada Fund will help to open the door to greater possibilities for P3s in Canada ."

They have advantages and disadvantages, one of the disadvantages being the city has little to no direct control over the process. An advantage being a point the mayor made today, the $1.8 billion budget hasn't changed as a result of the delay announced today.

As an aside, the original website for the P3 Canada Fund, the organization set up by Ottawa to facilitate P3 funding, now advertises the best online casinos in Canada. 😂
 

EdwardEdm

Active Member
Member Bio
Joined
Oct 22, 2021
Messages
112
Reaction score
342
Does anyone know if Calgary's elevated LRT had similar issues?
Not that I am aware of. Neither has Vancouver with all the concrete used on the Skytrain!

It seems to me too, that the construction of the piers for the elevated section was something that was running on time and seemed to be going well.

My question is: would this have happened if this was not a P3?

As much as the NLRT extension gets flak for being late, let's not forget the actual construction came in on time and under budget. The issue was that the City separately procured the CBTC signal system and kept on increasing requirements, up to and including making the legacy 1970's LRV's run under a degree of automatic control.
 