Stantec Tower | 250.84m | 66s | ICE District Prop.

What do you think of this project?


  • Total voters
    58
A couple potato camera shots from Old Strath...
179022

179020
 
It's not as big as I was expecting, but it's got the basics. I image they will shift their offerings when the Loblaws opens in a couple of years, too.

179455
179454


More weather protection being installed just outside:

179457
 
Last edited:
PERMIT_DATE April 03, 2019
JOB_CATEGORY Commercial Final
ADDRESS 160, 10220 - 103 AVENUE NW
NEIGHBOURHOOD DOWNTOWN
JOB_DESCRIPTION To construct interior and exterior alterations to a Professional, Financial and Office Support Services Use, tenant fit-up for Scotia Bank ice district, replace existing single mandoor with a double mandoor, and to align the proposed horizontal mullion above the double door to align with the existing horizontal mullion.
BUILDING_TYPE Office Buildings (520)
WORK_TYPE (03) Interior Alterations
CONSTRUCTION_VALUE 640,000
ZONING AED, AED
 
The Patio on 30 , those walls look to low. It was hard enough to go there during construction. I look at those photos and know I will not be going to that level if I had the chance.
 
Article coming today, but here's some photos of the six show suites. Open house coming April 13, 14, 27, and 28; register at experiencesky.ca.

731 square-foot plan "D":
P4100997.jpgP4100999.jpgP4101001.jpg

920 square-foot plan "A":
P4101013.jpgP4101014.jpgP4101018.jpgP4101023.jpg

628 square-foot plan "B":
P4101026.jpgP4101028.jpgP4101030.jpg

628 square-foot plan "C":
P4101045.jpgP4101048.jpgP4101051.jpg

1,221 square-foot plan "H":
P4101053.jpgP4101057.jpg
 

Back
Top