Connect Centre | 56.3m | 16s | ONE Properties | DIALOG

What do you think of this project?


  • Total voters
    57
@Grandinite Not sure why they would do that when all of the infrastructure is already in place for Tower B.

When market conditions improve sufficiently, they'll be able to get this one off the ground much more rapidly.
 
I personally think they'll move the tower to the land the own on 104 street next to the affordable storage building. They also own the old CBSA building adjacent to this

I can't see that happening honestly with them not downsizing the columns being poured and putting a tower crane in place. I'd imagine there would have been some cost savings if preparation for a tower wasn't required.
 
@Grandinite Not sure why they would do that when all of the infrastructure is already in place for Tower B.

When market conditions improve sufficiently, they'll be able to get this one off the ground much more rapidly.

How freely would they be able to start building a tower when the podium is fully tenated?
 
2809AB31-BB8F-4923-8354-41DCCDAAF120.jpeg
27181A6A-8BB7-418E-95A0-0B6CD580AA50.jpeg
DAC2DC1A-F93B-44AC-8C92-F2744BD9D94B.jpeg
 

Back
Top