Footprint Development | ?m | 6s | Landmark Homes | Next Architecture

Daveography

Administrator
Staff member
Member Bio
Joined
Sep 22, 2015
Messages
10,218
Reaction score
23,059
Location
Edmonton, Alberta, Canada
Looks like that property just behind the new J22 is up for rezoning; goes to EDC on May 15:

B.5. 19:30 Footprint Development (Rezoning)
10126 & 10142 122 Street NW
Alexis Finlay - GEC Architecture

https://www.edmonton.ca/city_government/documents/EdmontonDesignCommittee_May_15_2018_Agenda.pdf

Capture.PNG
 

Attachments

  • Capture.PNG
    Capture.PNG
    1.9 MB · Views: 861
B.5. Footprint Development (Rezoning)
10126 & 10142 122 Street NW
Alexis Finlay - GEC Architecture

MOVED: A. Zepp Motion of support with conditions.

The Committee recommends that the Applicant continue to work with Administration, including the Urban Design Unit, to
● Ensure the DC text includes and references key appendices, including building elevations and a landscape plan.
● Include in the DC text regulations which ensure both the tower and podium are sufficiently articulated to reduced their perceived mass. As appropriate, include regulations which encourage the use of materials sensitive to the architectural context of the project.
● Include in the DC text regulations that strongly encourage the incorporation of colours and materials, as well as exploration of other design techniques, to reinforce winter city design principles.

SECONDED: D. Brown
CARRIED
FOR THE MOTION: W. Sims, M. Figueira, A. Zepp, T. Antoniuk, S. Kaznacheeva, J. Mills, C. Holmes, D. Brown, B. Nolan

https://www.edmonton.ca/city_government/documents/EdmontonDesignCommittee_May_15_2018_Minutes.pdf
 
Last edited:

Back
Top