Airboy
Senior Member
If they are removing it, they are going about it a little differently. Looks like they are redoing the roof. But why would they demo the building with no back up mechanical room.
The Kitchen Ventilation is out at the Loading dock. But the main HVAC is right there.
The Kitchen Ventilation is out at the Loading dock. But the main HVAC is right there.