News   Apr 03, 2020
 7.3K     3 
News   Apr 02, 2020
 7.5K     0 
News   Apr 02, 2020
 2.6K     0 

City of Grande Prairie Updates

grande-prairie-place-1.jpg

The main floor commercial is designed for retail, office and restaurant use and can accommodate lease areas from 1,000 sqft to the entire available footprint. The corner residential entrance creates separation for tenants while the pedway link to the existing Grande Prairie Place allows for movement between both buildings.

The building incorporates a multi-purpose / function room at level 2 that can be accessed by residential and commercial tenants with a roof terrace for seasonal use.

The residential tower has a 70/30 mix of 1- and 2-bed units to align with market demand studies. The building incorporates a high performance building envelope with triple glazed units, high efficiency mechanical systems, geothermal heating and cooling and LED lighting.
 
Love seeing things happening in other Albertan Cities 😃
 
1610142752635.png

O'Brien Lake West School​

Construction of the O'Brien Lake West School in Grande Prairie. Upon completion, the school will be able to accommodate up to 900 students in grades K - 9.
Municipality:Grande Prairie
Sector:Institutional
Type:School
Schedule:2020 - 2022
Estimated Cost:$36.1M
Stage:Under Construction
Developer:The Grande Prairie Roman Catholic Separate School Division
Contractor:Lear Construction Management Ltd.
Architect:Stantec Group
Project Website:https://obrienlakewest.gpcsd.ca/
 
That was such a cluster f from the beginning. GoA started it with no plans for fitting it out. then they funded that but did not do proper planning. then standards changed and they had to do upgrades. Then they lost the Mechanical Contractor. it goes on from there.
 
Is the old hospital staying open?
For a time. I think there is a slight downgrade with most acute care moving to the new one, but the longterm care portion of the facility will probably use some of it as well. There were significant upgrades to that a few years back. The central power house will be kept as well.
 
Hey folks. I had the privilege to be on a tour of the new GP hospital back in late August to see the local photography integrated into the facility. They've started moving patients in now, so I think it's fair to share some photos. The art is a huge contribution to the facility and is integrated everywhere, including waiting rooms, elevator wayfinding, private staff areas, and on the ceilings in some examination rooms. It may have taken a very long time, but this facility will be a big boost to care in NW Alberta.
PXL_20210818_193532918.jpg
PXL_20210818_204053362.jpg
PXL_20210818_193901287.jpg
PXL_20210818_193501693.MP.jpg
PXL_20210818_194102491.jpg
PXL_20210818_194112542.MP.jpg
PXL_20210818_195419709.jpg
 
Last edited:

Back
Top