News   Apr 03, 2020
 7.7K     3 
News   Apr 02, 2020
 8.5K     0 
News   Apr 02, 2020
 2.8K     0 

Search results

  1. Y

    Capital Line LRT

    I want to say speaking municipaly, from one of the city councillors. Its in the p3 contracts.
  2. Y

    Alberta Politics

    Its being brought in house, its mot going away.
  3. Y

    Alberta Politics

    In a first past the post/electoral college system horse race polls are near useless. Vote efficiency needs to be taken into consideration and all ridings need to be looked at individually.
  4. Y

    ETS Bus and General Transit Improvements

    To be fair Post pandemic world is structured differently than the world today with more at home options for work and school. People are not “doing” as much as we focus on other rising costs. And We also went through a major network upheaval with the introduction of the new lrt line and new...
  5. Y

    East Junction | 86m | 25s | Regency Developments | DER + Associates

    How you feel something looks is subjective By the very fact that a number of people I have shown the building to have had positive reactions would prove it actually isnt “terrible.”
  6. Y

    Capital Line LRT

    Sorry yes TransEd, they will be operating the entire valley line
  7. Y

    Manulife Place Renovations | 145.99m | 36s | AIMCo | MdeAS

    I would be AMAZED if the gov’t approves this. There is a lot of history of deep sixing mergers in Canada’s already concentrated banking system.
  8. Y

    East Junction | 86m | 25s | Regency Developments | DER + Associates

    Many people on here are way to negative. I have had a number of people comment on how much they like this building.
  9. Y

    Capital Line LRT

    Translink is contracted to operate the west.
  10. Y

    Capital Line LRT

    Design build is a form of p3 contract. A P3 may but does not necessarily include things such as operation or maintenance. https://www.pppcouncil.ca/why-p3s/types-of-p3s
  11. Y

    Capital Line LRT

    Because its built under a p3 model. Certain economic minds will say that limits risk to the city, but it also means that you are just monetizing the risk up front.
  12. Y

    Capital Line LRT

    its a p3. The price is the price, the city doesn't manage the project.
  13. Y

    Low Level Bridge

    The high level is fine. It just needs its 25 year overhaul
  14. Y

    Municipal Politics

    Its also the pollsters, the format of the poll as well as a very active online campign about some unfounded corruption elevated by UCP and Right wing media. These same right wing actors are also trying to push 15 min city along with other things.
  15. Y

    Municipal Politics

    ok but the city does the majority of its trees and shrub replanting in the cool fall where they have a better survival rate. Removal of dead trees happens in spring/summer and replacement trees often happen the following year after they have been removed. There are some gardening...
  16. Y

    Blatchford Development | ?m | ?s | City of Edmonton

    This is indeed where the number was pulled from.. via my adhd memory filter which can jumble things up on occasion.
  17. Y

    Blatchford Development | ?m | ?s | City of Edmonton

    I have heard 320ish homes/units are set to start construction within a year.
  18. Y

    ICE District Phase 2 | 149.95m | ?s | ICE District Prop.

    I think there were a few other reasons why there are no games… all in the form of poisoned pills put into the negotiations by the province.
  19. Y

    ICE District Phase 2 | 149.95m | ?s | ICE District Prop.

    Given modern expectations and the cost of tickets for big stadium shows etc, I feel replace is really the only real option. Commonwealth, like the queen was, is a relic of the past. I believe it initially had bench seating, may be wrong on that one. edit: went and did my research: Just the...
  20. Y

    Municipal Politics

    Where is this? I drive all over the city I cant think of one flower/shrub bed that is left furlough. Did you call 311 so it can be accessed and addressed?

Back
Top