Winspear Centre Completion Project | 29.87m | 4s | Winspear Centre | Andrew Bromberg

What do you think of this project?


  • Total voters
    48
The District Energy component is getting taller:

C1D202A7-5429-4D57-9FA6-749722832A7E.jpeg
 
BP:

Jul 18, 2022
Commercial Final
STRUCTURAL FRAME ONLY 2nd level of above grade "music box superstructure" on top of the first level of the above grade superstructure (B.P. 341529008-036) and the existing one storey underground parkade (B.P. 286547690-002). Remainder of building to follow in separate permit submission-- "Francis Winspear Centre for Music
$8,500,000
10210 - 97 STREET NW
 
BP:

Jul 18, 2022
Commercial Final
STRUCTURAL FRAME ONLY 2nd level of above grade "music box superstructure" on top of the first level of the above grade superstructure (B.P. 341529008-036) and the existing one storey underground parkade (B.P. 286547690-002). Remainder of building to follow in separate permit submission-- "Francis Winspear Centre for Music
$8,500,000
10210 - 97 STREET NW
What's the purpose of breaking the BPs into phases like this? Quicker turnaround time for the city?
 
Ish... but from what I understand there have been multiple changes in scope, budget and design.
So should we be preparing for a watered down, bait and switch version of the original plan ala the Stanley Milner Library

Given the scope, design and budget change, I cant imagine we are going to be seeing something that will blow our minds out of the water that is better than the original version everyone was promised...
 

Back
Top