Quick update for Garneau 110 St, sidewalks and curbs are in but still awaiting work on the roadway itself, just north of University Ave.
Also passed by the Malmo 115 St SUP last week and it's now fully open, no photos. Bit of progress on the alley SUP too but not too different from my...
Been a while since the last update for Malmo Plains and the 115 St SUP. Heading SB from South Campus:
115 St SUP, Lendrum (fully open):
115 St SUP, Malmo (open except a single closure at the south end by the school):
Whitemud Alley SUP, ped overpass (still a lot to do):
I worked a co-op student term with CoE Safe Mobility this past winter and these were added as prelim installations for Brander Gardens Street Labs. The similar temporary curb extensions popping up elsewhere city-wide are part of the Safe Crossings Program this year.
No photos as I didn't want to stop in the road amidst all the construction, but 110 St in Garneau now has new sidewalks on the east side and new curbs in place around 79 Ave to 81 Ave
No photos this time, but I've been passing through 110 St in Garneau every week on the commute to the office. The remaining section Project 32 is now full steam ahead with all the roads closed except for local traffic and construction equipment busy on site. They also added the cycle track...
Rode through 110 St and 88 Ave in Garneau yesterday and can report that the cycle tracks were fully swept (just waiting on road markings):
NB 110 St at 76 Ave (Project 31)
NB 110 St at 77 Ave (Project 31)
NB 110 St at University Ave (Project 31)
NB 110 St at 80 Ave (Project 32, to be...